Skip to main content
InQuantWeTrust logo

Learning paths

Build quantitative analysis skills in order

Public paths turn scattered references into stable, checkable sequences for research methods, backtest evaluation, risk review, and portfolio discipline.

Paths

3

Checkable steps

12

Estimated time

4 hr 10 min

Progress-friendly, public by default

Each path, module, and step has a stable ID for future progress tracking. The checkboxes below are intentionally browser-only and are not saved to an account or database.

Path index

Path 1

Quantitative method foundations

Turn an idea into a testable research question with documented assumptions, metrics, and limitations.

LevelBeginner
Modules2
Steps4
Estimate1 hr 15 min

Outcome

A one-page research brief with a falsifiable hypothesis, metric, sample boundary, and rejection condition.

Audience

Readers who want a disciplined starting process before interpreting quantitative results.

Prerequisites

  • A research question
  • A comparison baseline
  • Willingness to record limitations

Safety notes

  • Do not treat early analysis as a recommendation or forecast.
  • Write assumptions before reviewing outcomes so hindsight does not rewrite the test.
1

Shape the question

Convert a broad idea into a measurable claim.

  1. read10 min

    Done when: The claim names the behavior being tested and the expected direction.

  2. review15 min

    Done when: A result threshold and rejection condition are written before analysis begins.

2

Record assumptions

Make boundaries explicit so results can be reviewed later.

  1. setup20 min

    Done when: The sample period, excluded data, and primary metric are documented.

  2. report30 min

    Done when: Known weaknesses are recorded next to the hypothesis, not after publication.

Capstone

Research brief

Create a one-page brief with hypothesis, sample, metric, expected failure modes, and the next decision.

  • One-sentence claim
  • Metric and sample definition
  • Limitations note

Path 2

Backtest evaluation discipline

Review historical simulations with bias checks, benchmark comparisons, and cost sensitivity.

LevelIntermediate
Modules2
Steps4
Estimate1 hr 30 min

Outcome

A backtest review card that separates evidence, assumptions, and unresolved risks.

Audience

Readers who need to evaluate research results without overstating historical evidence.

Prerequisites

  • Completed method brief
  • Benchmark definition
  • Cost assumptions

Safety notes

  • Historical fit does not guarantee future performance.
  • Flag fragile results that depend on narrow dates, high turnover, or a single parameter choice.
1

Run the bias review

Check the most common ways historical analysis can overstate confidence.

  1. verify20 min

    Done when: The review notes how unavailable future information and missing failed assets were handled.

  2. verify25 min

    Done when: The result is compared under base, conservative, and severe friction assumptions.

2

Write the review card

Summarize the result in language that does not overclaim.

  1. report20 min

    Done when: Performance is compared to a relevant baseline and not presented in isolation.

  2. review25 min

    Done when: The result is labeled continue, revise, reject, or monitor with a reason.

Capstone

Backtest review card

Produce a concise card with headline result, benchmark, bias checks, cost sensitivity, and decision label.

  • Bias checklist
  • Cost sensitivity table
  • Decision label

Path 3

Risk and portfolio review

Connect single-idea analysis to drawdown, concentration, allocation, and review cadence.

LevelIntermediate
Modules2
Steps4
Estimate1 hr 25 min

Outcome

A portfolio review note with exposure limits, drawdown thresholds, and allocation rationale.

Audience

Readers moving from isolated research notes toward portfolio-level decision quality.

Prerequisites

  • At least one research result
  • Defined risk tolerance
  • Portfolio or model-sleeve context

Safety notes

  • Risk limits should be written before a result becomes emotionally persuasive.
  • Do not ignore path-dependent losses just because average results look acceptable.
1

Frame the downside

Review whether the worst paths are survivable and acceptable.

  1. safety20 min

    Done when: Maximum tolerated drawdown and action triggers are documented.

  2. review20 min

    Done when: The note includes at least three adverse scenarios and expected responses.

2

Review allocation fit

Document how the idea interacts with the broader portfolio.

  1. report20 min

    Done when: The idea's major exposures and overlap with existing holdings are listed.

  2. setup25 min

    Done when: Allocation changes have a cadence, tolerance band, and exception policy.

Capstone

Risk review note

Write a review note covering drawdown triggers, stress scenarios, exposure overlap, and allocation rule.

  • Drawdown threshold
  • Stress scenario list
  • Allocation rule

Important disclaimer

This content is for educational and technical research purposes only. It is not financial advice, investment advice, trading advice, tax advice, or legal advice. Backtests and examples may contain errors or omissions. Past performance does not guarantee future results. Always test code in a safe environment before using it with real accounts or live trading systems.

InQuantWeTrust publishes educational content for quantitative research and analytical methods. It does not provide personalized advice, trade recommendations, managed services, or guaranteed outcomes.